Bathroom Remodeling

Transforming the grasp bathroom / Oppussing av negative





So time for the master/upstairs lavatory. This was a large enterprise, it took a lot longer than I imagined.. took about 3,5 months to full, some of it thanks to ready on the bathtub and some other stuff to get there, but this was a great deal of perform. I believe the finish-result appears to be like incredibly good, and It came out wanting accurately as I developed it in sketchup.

Partitions are water-proof bathroom panels from Fibo Trespo.

AND THIS IS NOT A “HOW TO” 🙂

supply

34 comments

Have your say