Basement Renovation

Basement Renovation | NOVA Basement Ending





This undertaking begun as an unfinished basement. We began by framing the perimeter and interior partitions. The egress window was completely mounted through the framing. Future, we roughed in our plumbing drains, electrical strains, and HVAC registers. After passing our tough-in and groundwork inspections, we ran our waterlines for the toilet. Following the concealment inspection, we had been clear to close in all the rough-in work with insulation and drywall. Following all the drywall was totally dry from the compound, sanding, and blocking, we primed the partitions and ceiling. The to start with coat of paint was up coming adopted by the tile do the job for the lavatory and LVT flooring all through the full basement. The rest room fixtures and doorways ended up subsequent to be installed. Following the doors have been all in, we did a remaining coat of paint. The stair railing, stair carpet, and glass shower doorway ended up the last parts to the puzzle!

supply

Have your say