Basement Renovation

Basement Remodel – Portion 2





I’m joining The Makers Mob:

I have been continuing to do the job on the basement job. The up coming part is making the initially shelf on the new basement wall. For this to start with shelf and the other shelves on this wall, I am employing the remaining pieces of glue lam beam we salvaged from the demolition of our pool composition. I experienced to rip the beams in 50 % with a ability noticed in order to go them into the store. With the band observed, I minimize the parts of the beams into 3 slabs to variety the cabinets. I glued two parts again together to make the sections for the bottom shelf as it will be wider than the other shelves. I slice out a sequence of plugs to go over the knots and defects in the best of the self. The plugs are formed like cats. I then formed the shelf to its final sort.

Basement Transform – Element 1

Instruments utilized in this project can be located at

To see future assignments observe me on social media

Patreon

Instagram

Twitter

Fb

resource

28 comments

Have your say