Bathroom Remodeling

Kitchen area Reworking – Working day 2 of 17 – Demolition of Cabinets and Floor





This video goes by the the vast majority of the kitchen area demolition approach, together with the tear down of all cupboards, demolishing the tile floor down to the slab basis, and getting rid of some sheetrock and backsplash.
This was our initial whole working day of do the job on the kitchen area remodel. My brother Neil (in Gray) and I (in Green) are joined by two other helpers as very well, and we promptly development by the demolition course of action.
Instruments employed: Dewalt Reciprocating Observed, Dead On Applications Annihilator Wrecking Bar, 3M Respirators, Dewalt 20V Drill and Effect Driver, Bosch Oscillating Software, WEN 3410 Air Filtration Technique, Neiko Demolition Hammer, Bosch 11255VSR Rotary Hammer, Bosch SDS Tile Chisel Bit, Ridgid Damp/Dry Shop Vacuum

resource

4 comments

Have your say